Detroit and Hamtramck, Michigan, US · Electric vehicle assembly
Factory ZERO is General Motors’ electric-vehicle assembly plant at the former Detroit-Hamtramck Assembly Center. The original facility opened in 1985; its reopening as Factory ZERO in 2021 gave an established Michigan factory a new role building electric trucks and SUVs.
Facility at a glance
| Manufacturer | General Motors |
|---|---|
| Address | 2500 East Grand Boulevard, Detroit, Michigan |
| Facility type | Electric-vehicle assembly |
| Original opening | 1985, as Detroit-Hamtramck Assembly |
| EV conversion grand opening | November 17, 2021 |
| Announced conversion investment | $2.2 billion |
| Products listed by GM in July 2026 | Chevrolet Silverado EV; GMC Sierra EV; GMC HUMMER EV Pickup and SUV; Cadillac Escalade IQ |
Products and manufacturing systems
GM’s July 2026 plant overview assigns Factory ZERO electric pickups and SUVs from Chevrolet, GMC, and Cadillac.
At its 2021 opening, GM described a manufacturing system built around its Ultium platform, combining battery modules and packs, drive units, motors, and power electronics. Shared machinery, tooling, and assembly processes supported this approach. GM’s facility information also identifies contiguous battery assembly as a feature of the operation.
Conversion of an existing factory
GM announced $2.2 billion to renovate the site for electric trucks and SUVs and celebrated the Factory ZERO grand opening on November 17, 2021. At the event, the company said retooling had required about two-thirds of the capital needed for a comparable new plant. Virtual tools and parallel production-engineering work were part of the conversion process.
Site features and material reuse
GM says crushed concrete from the old factory floor was reused for temporary roads. Its published facility features include a 30-kilowatt solar carport, a 516-kilowatt ground-mounted solar array, and a 16.5-acre wildlife habitat. These details show how the conversion involved the wider industrial site as well as the assembly line.
Sources and review
- GM U.S. operations — facility address and original opening
- GM July 2026 assembly overview — Factory ZERO vehicle assignments
- GM November 2021 grand opening — investment and manufacturing conversion
- GM Factory ZERO facility information — battery assembly and site features
Last reviewed November 17, 2026. Product assignments and expansion plans can change; dates identify the company information used for this profile.
Explore related profiles
General Motors profile · Browse North American vehicle factories